Name of branch: Datong Branch of Beijing SPC Environment Protection Tech Co., Ltd.;
Founded in: March, 2013;
Unit capacity: 2*220MW+2*300MW coal-fired generator unit;
Address: SPC Datong Branch in the fence of Datang International Yungang Thermal Power Co., Ltd. in Datong, Shanxi;