运营网络Operate

Home > Operate > Datong Branch
Return Home

Name of branch: Datong Branch of Beijing SPC Environment Protection Tech Co., Ltd.;

Founded in: March, 2013;

Unit capacity: 2*220MW+2*300MW coal-fired generator unit;

Address: SPC Datong Branch in the fence of Datang International Yungang Thermal Power Co., Ltd. in Datong, Shanxi;